Gateway Upgrade North

Description The Gateway Upgrade North was jointly funded by the national and state governments on a 80:20 split. This project was delivered by the Department of Transport and Main Roads with assistance from Trans urban Queensland under a Design & Construct contract with Lendlease Engineering Pty Limited. Its completion was announced on March 2019. The

Read More

Logan Enhancement Project

Description The Logan Enhancement Project(LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion hot spots and constructing new south-facing on and off-ramps on the Gateway Extension Motorway at Compton Road. LEP is made up of five components. It is an integrated transport solution that will unlock the economic potential

Read More

Ipswich Motorway Upgrade Rocklea to Darra

Description Rocklea to Darra -Stage 1 is the 3km upgrade of the Ipswich Motorway between Granard Road, Rocklea and Oxley Road, Oxley. Key elements of the upgrade include: Upgrading the motorway from 4 to 6 lanes Higher bridges over Oxley Creek, including 7 new bridges New southern service road connection from Rocklea industrial precinct to

Read More

Bruce Highway Interchange Upgrades – Maroochydore Rd & Mons Rd

Description Upgrades to the Marrochydore Road and Mons Road interchanges on the Bruce Highway near Forest Glen and associated infrastructure works. The design does not include any changes to the current provision of 4 traffic lanes (2 each way) on the Bruce Highway at this location. The Bruce Highway Interchange Upgrades – Maroochydore Road and

Read More

Bruce Highway Upgrade (Caboolture to Steve Irwin Way)

Project Highlights Water – Wat-1 The project achieved a level 3 score of 5.50 for this credit.  The Project achieved a reduction in water demand of 19.9%. The key construction initiative that led to this reduction was the use of a binder for dust suppression which is expected to reduce the watercart runs by ~50%. 

Read More

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

Project Highlights Materials – Mat-1 The project achieved a level 3 score of 7.24 points for this credit. The Project achieved a 33% reduction in materials use impacts for VL2B-BIC, compared to the base case footprint. Key initiatives that led to this reduction included:  Retaining the existing Reedy Creek Flyover, overall reduction of earthworks. Contributing

Read More

M1 Pacific Motorway Upgrade Palm Beach to Tugun

Project Highlights Energy and Carbon – Ene-1  This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include:   Biofuel Consumption  Wind Farm  Solar Photovoltaic (PV) arrays  Due to the use of these renewable technologies, it has allowed there to be an increase of 179369 GJ

Read More

Red Sand Ecology

Red Sand Ecology is a leading environmental consultancy that collaborates with clients and delivers innovative and solution-focused results. We provide a variety of ecological and environmental management services to clients across Queensland and New South Wales. Our capabilities combine years of behind the scenes and on the ground experience in the construction, mining and energy, agriculture, government, and infrastructure sector.

Read More

M1 Pacific Motorway Upgrade Burleigh to Palm Beach

Project Highlights Urban Design – Urb-1  The project achieved a level 3 score of 4.69 for this credit.   Key initiatives that led to this score included:     Preparation of a VL2T Landscape and Urban Design Strategy (at the Program level to ensure consistency) and development of a package-specific Urban Design Plan (which responded to the overarching Strategy)   Conducted internal reviews on urban and

Read More

Smithfield Bypass Project

Project Highlights Energy and Carbon – Credit Ene – 1  This project has achieved a Verified Level 3 with a Verified Score of 11.36. They have achieved a reduction of 32.9 %   The initiatives used within this credit include:   A reduction in vegetation Clearing of 248,000 m2  Change of lighting from HPS to LED   Reduction

Read More

Thank You

Thank you for submitting your ISupply Application Listing. Our team will verify the information you provided and be in contact if we need additional information. This process can take up to 10 business days. If you have any concerns or would like to speak to one of our team in the interim, please contact us