LXRP MRPA – Clyde Road, Berwick

The Clyde road level crossing removal project is on the Pakeham rail line adjacent to Berwick station. Road under rail solution to remove the current interface between road users and rail

Read More

Transport Access Program 3 – Hawkesbury River and Warrawee Station Access Upgrades (TAP3)

Overview The Hawkesbury River and Warrawee Stations Upgrades are part of the third tranche of Transport for NSW’s Transport Access Program, known as TAP 3 and seeks to improve access to public transport for those with disability, those with limited mobility or parents with prams and customers with luggage (TAP 3 | Transport for NSW).

Read More

Centenary Bridge Upgrade

The Centenary Bridge Upgrade in Jindalee proposes a new 3-lane northbound bridge, rehabilitation of the existing bridges to 3 lanes southbound, plus opportunities for improved active transport. This extra capacity would provide greater efficiency and travel-time reliability between Brisbane’s CBD and the western suburbs, between local destinations, and along the entire Centenary Motorway. The planning

Read More

North-South Corridor – Regency Road to Pym St

The Australian and South Australian governments have jointly committed $354.3 million to construct the Regency Road to Pym Street (R2P) Project as part of their overall commitment to build a non-stop North-South Corridor. The project comprises an at-grade motorway from the existing motorway infrastructure to the north (South Road Superway); an overpass of the motorway

Read More

Transport Access Program 3 – Mittagong and Fairy Meadow Stations

Key benefits: Fairy Meadow Station two new lifts; a new family accessible toilet on each platform; upgraded CCTV and lighting for improved safety and security; upgraded footpaths between the car park and station; a new kiss and ride space; a new Boarding Assistance Zones and hearing loops to both platforms; removal of existing track level

Read More

High Capacity Metro Trains (HCMT)

Melbourne’s bigger, better trains will initially run on the Cranbourne and Pakenham lines and will eventually run through the Metro Tunnel to Sunbury. High-capacity signaling will allow the fleet

Read More

M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun

J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun  Package Number  J323  J324  J325  Package Name  M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh  M1 Pacific Motorway Upgrade Palm Beach to Tugun  M1 Pacific Motorway Upgrade Burleigh to Palm Beach  Capex ($m)  96.8  270.2  208.2  Certified Score  81.62  79.11  81.74  Overall Weighted Average  80.49   

Read More

LXRP WPA – Aviation Road & Wyndham Vale Stabling

The Level Crossing Removal Project (LXRP) was established by the Victorian Government to oversee one of the largest rail infrastructure projects in the state’s history. LXRP is part of the Major Transport Infrastructure Authority and our projects fall under Victoria’s Big Build. Central to the project is the elimination of 75 level crossings across metropolitan Melbourne by 2025, in addition to other rail network upgrades such as new train stations, track duplication and train stabling yards.

Read More

Central Interceptor

The Central Interceptor is New Zealand’s largest wastewater tunnel project, consisting of a 14.7 km main tunnel, multiple shafts, a major pump station and substantial wastewater network infrastructure.

Read More

ACT Healthy Waterways As-Built

Project Overview The ACT Healthy Waterways Project is a joint initiative of the Australian and ACT governments to protect and improve long-term water quality in the ACT and further downstream in the Murrumbidgee River system. It involves the construction of a range of infrastructure – ponds, wetlands, and rain gardens – as well the restoration of creeks.

Read More

Parramatta Light Rail Stage 1 – Infrastructure Works

Parramatta Light Rail is one of the NSW Government’s major infrastructure projects being delivered to serve a growing Sydney. Parramatta Light Rail Stage 1 (Stage 1) will connect Westmead to Carlingford via Parramatta Central Business District (CBD) and Camellia. Stage 1 is expected to be operational in 2023. Stage 1 will create new communities, connect

Read More

Albion Park Rail Bypass

A 9.8 km extension of the M1 princes Motorway between Yallah and Oaks Flats to bypass Albion Park Rail. The purpose of the project is to complete the ‘missing link’ of motorway standard road

Read More