Search Results for: -水疗会所外围(高级资源)acapm
LXRP SPA – Initial Works Package (IWP)
Overview The project scope included: Removing four level crossings in Carrum and Seaford Building a new elevated Carrum Station Constructing a road bridge connecting Station Street across Patterson River Constructing the new Kananook Train Storage Facility in Seaford Opening new community spaces and shared-use paths Rating Highlights Aboriginal co-design process Indigenous urban marker at Patterson
Read MoreHaughton River Floodplain Upgrade
Project Highlights Materials The project achieved a Level 3 score of (7.65/7.65 points) for this credit 39% reduction is environmental impact. The materials calculator estimates that that the environmental impact of the actual case is 39% lower than the base case. This reduction is due to the actual case having nine fewer bridges than the
Read MoreGateway Upgrade North
Description The Gateway Upgrade North was jointly funded by the national and state governments on a 80:20 split. This project was delivered by the Department of Transport and Main Roads with assistance from Trans urban Queensland under a Design & Construct contract with Lendlease Engineering Pty Limited. Its completion was announced on March 2019. The
Read MoreLogan Enhancement Project
Description The Logan Enhancement Project(LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion hot spots and constructing new south-facing on and off-ramps on the Gateway Extension Motorway at Compton Road. LEP is made up of five components. It is an integrated transport solution that will unlock the economic potential
Read MoreIpswich Motorway Upgrade Rocklea to Darra
Description Rocklea to Darra -Stage 1 is the 3km upgrade of the Ipswich Motorway between Granard Road, Rocklea and Oxley Road, Oxley. Key elements of the upgrade include: Upgrading the motorway from 4 to 6 lanes Higher bridges over Oxley Creek, including 7 new bridges New southern service road connection from Rocklea industrial precinct to
Read MoreBruce Highway Interchange Upgrades – Maroochydore Rd & Mons Rd
Description Upgrades to the Marrochydore Road and Mons Road interchanges on the Bruce Highway near Forest Glen and associated infrastructure works. The design does not include any changes to the current provision of 4 traffic lanes (2 each way) on the Bruce Highway at this location. The Bruce Highway Interchange Upgrades – Maroochydore Road and
Read MoreBruce Highway Upgrade (Caboolture to Steve Irwin Way)
Project Highlights Water – Wat-1 The project achieved a level 3 score of 5.50 for this credit. The Project achieved a reduction in water demand of 19.9%. The key construction initiative that led to this reduction was the use of a binder for dust suppression which is expected to reduce the watercart runs by ~50%.
Read MoreM1 Pacific Motorway Upgrade Varsity Lakes to Burleigh
Project Highlights Materials – Mat-1 The project achieved a level 3 score of 7.24 points for this credit. The Project achieved a 33% reduction in materials use impacts for VL2B-BIC, compared to the base case footprint. Key initiatives that led to this reduction included: Retaining the existing Reedy Creek Flyover, overall reduction of earthworks. Contributing
Read MoreM1 Pacific Motorway Upgrade Palm Beach to Tugun
Project Highlights Energy and Carbon – Ene-1 This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include: Biofuel Consumption Wind Farm Solar Photovoltaic (PV) arrays Due to the use of these renewable technologies, it has allowed there to be an increase of 179369 GJ
Read MoreRed Sand Ecology
Red Sand Ecology is a leading environmental consultancy that collaborates with clients and delivers innovative and solution-focused results. We provide a variety of ecological and environmental management services to clients across Queensland and New South Wales. Our capabilities combine years of behind the scenes and on the ground experience in the construction, mining and energy, agriculture, government, and infrastructure sector.
Read MoreM1 Pacific Motorway Upgrade Burleigh to Palm Beach
Project Highlights Urban Design – Urb-1 The project achieved a level 3 score of 4.69 for this credit. Key initiatives that led to this score included: Preparation of a VL2T Landscape and Urban Design Strategy (at the Program level to ensure consistency) and development of a package-specific Urban Design Plan (which responded to the overarching Strategy) Conducted internal reviews on urban and
Read More