Search Results for: -水疗会所外围(高级资源).zid
Kangaroo Point Bridge
Brisbane City Council is building new green bridges across Brisbane, including the Kangaroo Point Bridge. This will ensure Brisbane continues to be a great place to live, work and relax, and will provide the perfect way for residents to explore our river city during the Brisbane 2032 Olympic and Paralympic Games, leaving a lasting legacy
Read MoreHealesville Koo Wee Rup Road South Upgrade Project
Overview The Healesville-Koo Wee Rup Road Upgrade Project involves the duplication of 10km of Healesville-Koo Wee Rup (HKWR) Road between Manks Road and Princes Freeway East (Princes Freeway). The Project is being delivered in two packages as separate projects: the HKWR Rd Upgrade (North Section) Project and the HKWR Rd Upgrade (South Section) Project. HKWR
Read MoreAdelaide Metropolitan Passenger Rail Network (AMPRN)
Keolis Downer Adelaide (KDA) is the proud operator of the Adelaide Metro train services. KDA is partnering with the South Australian Government to deliver enhanced train services and increase the use of public transport in South Australia. The AMPRN carries over 15 Million passengers every year across 6 rail lines which consists of 132km
Read MoreBrisbane Metro Project: Inner City Infrastructure Works
Brisbane City Council (Council) is moving ahead with the turn-up-and-go Brisbane Metro, which will revolutionise public transport in Brisbane. Brisbane Metro will be a key part of Brisbane’s greater transport network, connecting the city to the suburbs, making it easier to connect with the people and places you love. Brisbane Move (construction-lead ACCIONA and design-lead
Read MoreWestern Packages (Cherry St, Werribee Street & Old Geelong Road Level Crossing Removals)
Description The Western Packages (Cherry Street, Werribee Street and Old Geelong Road Level Crossing Removals) consists of 3 level crossing removal projects delivered in the Werribee/Hoppers Crossing region. These projects are delivered by the Western Program Alliance to remove the 3 boom gates and increase trains running on the Werribee line. As part of these
Read MoreTownsville Ring Road Stage 5 – Design
Description: The Townsville Ring Road Stage 5 (TRR5) project will deliver improved road safety, efficiency and travel time reliability for freight and passenger vehicles on the Bruce Highway in Townsville. The project forms part of a larger 36-kilometre section of highway known locally as the Ring Road with the TRR5 project being the final component
Read MoreLathams Road Upgrade Project – Design
Overview The Lathams Road Upgrade Project involved the duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the EastLink entry and exit ramps to Oliphant Way. The length of carriageway upgraded is
Read MoreCranbourne Line Upgrade (Package A)
The Cranbourne Line Upgrade (CLU) is a rail enhancement project to be delivered jointly by the Western Program Alliance (WPA) and the South Eastern Program Alliance (SEPA) and consists of
Read MoreThe New Murray Bridge Wastewater Treatment Plant
The existing wastewater treatment plant is located south east of the Murray Bridge township and adjacent to the River Murray and was constructed in 1970. Since this time Murray Bridge has…
Read MoreM1 Pacific Motorway Upgrade Varsity Lakes to Burleigh
Description The Varsity Lakes to Burleigh package is under the M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Program In this 2km section of the overarching Varsity Lakes to Tugun upgrade, the department has: widened the M1 to a minimum of 3 lanes in both directions extended and relocated the Exit 85 northbound off-ramp
Read MoreM1 Pacific Motorway Upgrade Palm Beach to Tugun
Rating Highlights Category Credits Achievements/Risks Energy and Carbon Ene-1 This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include: Biofuel Consumption Wind Farm Solar Photovoltaic (PV) arrays Due to the use of these renewable technologies, it has allowed there to be an increase
Read MoreM1 Pacific Motorway Upgrade Burleigh to Palm Beach
J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Package Number J323 J324 J325 Package Name M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh M1 Pacific Motorway Upgrade Palm Beach to Tugun M1 Pacific Motorway Upgrade Burleigh to Palm Beach Capex ($m) 96.8 270.2 208.2 Certified Score 81.62 79.11 81.74 Overall Weighted Average 80.49
Read More