Project Description:
The Lathams Road Upgrade Project involved the duplication and widening of Lathams Road from two lanes to four lanes between Oliphant Way and Frankston-Dandenong Road, including a new bridge over the Mornington Peninsula Freeway and widening and tie-in to the EastLink entry and exit ramps to Oliphant Way. The length of carriageway upgraded is 2.5km.
Rating Highlights
Category | Credit | Achievements/ Description |
Materials | Over 180,000 tonnes of recycled content used in construction materials. 40% Portland Cement Reduction across all concrete mixes. | |
Energy | Lifecycle carbon and energy reduction of 15.3% across the design life of the Project. 24% of construction energy replaced with renewables. Over 900 tCO2e reduced through sustainable construction practices. | |
Climate Change | 100% of high rated and 82% of medium rated climate change risks addressed with adaptation measures throughout design and construction |
Verified Innovations
Innovation Name: Polyrok
Description: Recycled soft plastic aggregate replacement in concrete
Acknowledgements - People
The Lathams Road Upgrade Project team gives special thanks to the below for their assistance and advice in assisting Winslow Infrastructure successfully deliver its first As Built rating under the ISC rating scheme.
Edge Impact - Emma Rolls, Gabriella Costa, David Maucor, Julia Rogerson
Perspektiv - Simon Hooper
MRPV Sustainable Infrastructure team - Rhys Owen-Roberts, Adam Mullins, Tracey Carey
ISC Project Managers - Luke Sammut and Giovanni Negroni