John Gorton Drive and Molonglo River Bridge Project - ISCouncil

John Gorton Drive and Molonglo River Bridge Project

Project Details

  • Project Owner: BMD Constructions Pty Ltd
  • Rating Type: As Built Design
  • Registered Date: February 2023
  • Completion Date: December , 2025
  • Location: ACT
  • Stakeholders: Transport Canberra and City Services Directorate,Pitt and Sherry, GHD,BMD Constructions,COWI (UK)

Overview

It is a Contract requirement and a BMD Constructions objective. Our Client, TCCS, is also actively engaged and interested in pursuing a joint approach to the achievement of an IS rating for the project

• 1.7 km of dual carriageway arterial road
• 2 signalised intersections
• 3 span, 227m dual carriageway bridge with ability to accommodate light rail in the future
• Weathering steel box girders with a concrete deck
• Steel encased concrete piers with piled abutments
• Includes shared path access into adjacent development and river corridor, on-road cycle lanes and provision for public transport (bus stops)