IS Ratings Directory

The Infrastructure Sustainability Ratings Directory

Review all the most progressive assets and projects registered and certified with the ISC for an IS Rating. If your asset or project is not listed below, please speak to your IS Project Manager or contact casemanager@iscouncil.org for more information.

  • Certified

Rockwood Weir Project

QLD / Design

Project Description: Rookwood Weir is a mass concrete structure with fixed crest spillway, stilling basin, left and right abutments, low flow outlet, and dedicated fish and turtle passage solutions. Situated on the Fitzroy River, 66km south-west of Rockhampton, the completed weir will rise 16.2m above the riverbed and have a full supply volume of 74,325

Read More
  • Certified
  • Water

Rookwood Weir Alliance

QLD / As Built

Description: Rookwood Weir is a $367 million water infrastructure investment to drive new economic and employment opportunities for the agricultural industry and the community of Central Queensland.  It is a mass concrete structure with fixed crest spillway, stilling basin, left and right abutments, low flow outlet, and dedicated fish and turtle passage solutions. Situated on

Read More
  • Certified
  • Port/Harbour

Rous Head Industrial Park

WA / As Built

The project relates to the development of the reclamation area in Rous Head and comprises partitioning into lots, construction of the access roads, and the various services to the boundaries of the...

Read More
  • Undergoing a Rating
  • Rail

RPV – MTP – Rail Systems Alliance

VIC / Design

The $1.1 billion Rail Systems Alliance is being delivered by a consortium comprising CPB Contractors, Bombardier Transportation and Metro Trains Melbourne. It has registered for a Design v1.2 IS Rating.

Read More
  • Certified
  • Roads

SH29 Tauriko Enabling Works

NZ / Design

Description The Tauriko Enabling Works will improve safety at intersections of SH29 with Redwood Lane, Belk Road and Cambridge Road, enable development of up to 2400 homes within Tauriko West, support expansion of Tauriko Business Estate, protect the freight route to the Port, improve journey reliability and access to public transport, walking and cycling. Rating

Read More
  • Undergoing a Rating
  • Road

SH29 Tauriko Enabling Works

NZ / As Built

Description The Tauriko Enabling Works will improve safety at intersections of SH29 with Redwood Lane, Belk Road and Cambridge Road, enable development of up to 2400 homes within Tauriko West, support expansion of Tauriko Business Estate, protect the freight route to the Port, improve journey reliability and access to public transport, walking and cycling. Rating

Read More
  • Undergoing a Rating
  • Cycleways and footpaths Road

Smithfield Bypass Project

QLD / As Built

Project Highlights Energy and Carbon – Credit Ene – 1  This project has achieved a Verified Level 3 with a Verified Score of 11.36. They have achieved a reduction of 32.9 %   The initiatives used within this credit include:   A reduction in vegetation Clearing of 248,000 m2  Change of lighting from HPS to LED   Reduction

Read More
  • Undergoing a Rating
  • Road

South Australia Road Network Maintenance

SA / Operation

The State road network in South Australia is one of the state’s biggest infrastructure assets and covers approximately 25% of the state’s total road network. The network consists of over 13,000km of sealed roads and 10,000km of unsealed roads, tunnels, bridges, traffic signals, signage, verge and drainage. DM Roads are responsible for maintaining Zones 1 (metro) and 3 (North) of the network and deliver a combination of Base Service, Minor Works, Annual Renewal Works and Minor capital works.

Read More
  • Certified
  • Rail

South Eastern Program Alliance – Union & Mont Albert Level Crossing Removal Project

VIC / As Built

Description The Union & Mont Albert Rd Level Crossing Removal Project is located on the Belgrave / Lilydale rail line, approximately 12 km east of the Melbourne CBD. The project boundary is located within the City of Booroondara and the Whitehorse City Council municipalities in the suburbs of Surrey Hills and Mont Albert. The level

Read More
  • Certified
  • Road

South Gippsland Highway Level Crossing Project

VIC / Design

The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution was

Read More
  • Certified
  • Road

South Gippsland Highway Level Crossing Project

VIC / V 1.2 As Built

Description The South Gippsland Highway level crossing impedes the flow of 31,000 cars and trucks each weekday, with boom gates down for a third of the two-hour morning peak. The Victorian Government announced the removal of this crossing in November 2018 as one of 25 additional new crossings to be removed. The final design solution

Read More
  • Certified
  • Rail

Stockinbingal to Parkes – Daroobalgie and Wyndham Avenue Sites

NSW / Design

Description The Stockinbingal to Parkes section of the Inland Rail alignment is an enhancement project modifying specific sites along 170km of existing rail in regional New South Wales. The works planned to be completed as part of this project are: – Increasing vertical clearance under the Wyndham Avenue road bridge in Forbes; and – Building

Read More
  • Certified
  • Road

Sunbury Road Upgrade Project

VIC / As Built

Description Sunbury Road provides direct access to the Tullamarine Freeway, connecting road users with high capacity links to Melbourne’s CBD, the wider metropolitan area, as well as regional Victoria and interstate. It is also the primary route for trips from within the corridor to key employment hubs in Melbourne’s north including Epping, Somerton and Broadmeadows.

Read More
  • Certified
  • Rail

Sydney Metro City & SW – Line-wide Works

NSW / Design

Description: The Sydney Metro City & Southwest (SMCSW) project will extend Sydney Metro Northwest to the CBD through Chatswood and beyond to Bankstown. The project is being delivered through a suite of contracts for the tunnels, stations, line-wide infrastructure and systems. The Line-wide Works (LW Works) package is a key component of SMCSW with works

Read More
  • Certified
  • Rail

Sydney Metro City and Southwest – Central Station Main Works

NSW / As Built

Description Sydney Metro is Australia’s largest public transport project, transforming Sydney with more trains and faster services. At Central Station, construction includes:  Two new underground concourses  North-South Concourse above the new Metro station  Central Walk for better connectivity to trains, light rail, and new Metro platforms  Demolition and reconstruction of suburban rail platforms 12, 13,

Read More
  • Certified
  • Rail

Sydney Metro Northwest – Surface and Viaduct Civils

NSW / As Built

The $8.3 billion Sydney Metro Northwest is Australia’s biggest public transport project and a priority infrastructure investment for the NSW Government. It is the first stage of Sydney Rapid...

Read More
  • Certified
  • Rail

Sydney Metro West – Central Tunnel Package

NSW / Design

Description The Sydney Metro West – Central Tunnelling Package contract includes the delivery of twin 11 kilometre tunnels and excavation of five station boxes at Sydney Olympic Park, North Strathfield, Burwood North, Five Dock and The Bays. A crossover cavern at Burwood North and one of the two precast facilities at Eastern Creek where more

Read More
  • Railways

Sydney Metro West – Eastern Tunnelling Package

NSW / As Built Design

The Sydney Metro West, Eastern Tunnelling Package (ETP) involves the delivery of:  Enabling works such as demolition, utility supply to construction sites, utility adjustments and modifications to the existing transport network  Mined crossover cavern construction east of The Bays Station  4.2km of TBM Tunnel excavation, 650m of mined tunnels and 7 cross

Read More
  • Certified
  • Rail

TAP 3 – Killara and Turrella Stations Upgrades

NSW / Design

Description The Transport Access Program (TAP) aims to enhance the experience of public transport customers by providing accessible, modern, secure, and integrated transport infrastructure.  Upgrades to two existing train stations will include the following:  Construction of new lifts for access to station platforms and existing footbridges, complete with lift landings, canopies, throw screens, and support

Read More
  • Certified
  • Rail

TAP 3- Erskineville, St Peters, Normanhurst, Thornleigh, Pymble, Doonside Stations Upgrade

NSW / Design

Description The Transport for New South Wales (TfNSW) Transport Access Program (TAP) is an initiative to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure.    This project consists of six station upgrades which are delivered under Laing O’Rourke’s Managing Contractor Contract. The six stations are referred to

Read More
  • Certified
  • Rail

TAP3 – Unanderra Station Upgrade

NSW / Design

Description The Unanderra Station Upgrade Project (the Project) is part of the third tranche of Transport for NSW’s Transport Access Program, known as TAP 3 and seeks to improve access to public transport for people with disability or limited mobility, parents and careers with prams, and customers with luggage. Providing accessible transport services for everyone

Read More
  • Certified
  • Rail

TAP3 Birrong Station, Wollstonecraft Station, Roseville Station, Banksia Station and Canley Vale Station

NSW / Design

Project Description The project is part of the NSW Government’s the Transport Access Program, which aims to provide a better experience for public transport customers by delivering accessible, modern, secure and integrated transport infrastructure. Under the TAP program, five train stations were upgraded to provide accessible access to people with a disability, limited mobility, parents/carers

Read More
  • Certified
  • Rail

TAP3 Waitara Station

NSW / Design

Description: The upgrade works (the Project) were completed for Waitara Station as part of the Transport Access Program, an NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s Future Transport Strategy.

Read More
  • Certified
  • Open Space

Te Kori Scott Point

NZ / Design

Te Kori Scott Point is a 16.4ha area of land in the northwest of Auckland that is about to be transformed from a rural landscape to a public park to meet the needs of a new community.

Read More
  • Certified
  • Rail

TfNSW Hawkesbury River and Warrawee Station Access Upgrades (TAP3)

NSW / Design

Project Description The Hawkesbury River and Warrawee upgrade works (the Project) were completed as part of the Transport Access Program (TAP), a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Providing accessible transport services for everyone in the community is one of the six priorities for Transport for NSW’s

Read More
  • Certified
  • Rail

TfNSW Wahroonga, Narara and Lisarow Station Access Upgrades (TAP3)

NSW / As Built

Description: The Transport Access Program (TAP) is a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state, improving access to public transport for people with disability or limited mobility, and parents and carers with prams. This particular TAP 3 project scope includes the Wahroonga, Lisarow, and Narara train station upgrades.

Read More
  • Certified
  • Rail

TfNSW Wahroonga, Narara and Lisarow Station Access Upgrades (TAP3)

NSW / Design

Description: In summary, the TAP initiative exemplifies the commitment of the NSW Government to create a more inclusive and accessible public transport network. The improvements at Wahroonga, Lisarow, and Narara railway stations mark significant milestones in achieving this goal, with a focus on enhancing accessibility, safety, and convenience for all commuters.   Rating Highlights  Category  Credits 

Read More
  • Certified
  • Rail

The Metro Tunnel: Early Works

VIC / As Built

Overview The Metro Tunnel will untangle the City Loop by taking three of the Melbourne’s busiest train lines through a new tunnel under the city, creating space on the network for more than half a million peak passengers every week. The project will create a new end-to-end rail line from Sunbury in the west to

Read More
  • Certified
  • Water

The New Murray Bridge Wastewater Treatment Plant

SA / As Built

The existing wastewater treatment plant is located south east of the Murray Bridge township and adjacent to the River Murray and was constructed in 1970. Since this time Murray Bridge has...

Read More