IS Ratings Directory

The Infrastructure Sustainability Ratings Directory

Review all the most progressive assets and projects registered and certified with the ISC for an IS Rating. If your asset or project is not listed below, please speak to your IS Project Manager or contact casemanager@iscouncil.org for more information.

  • Certified
  • Rail

Level Crossing Removal Project Package 1 – Burke, North, McKinnon, Centre

VIC / As Built

The Burke North McKinnon Centre (BNMC) level crossing removal projects were the first four of 50 level crossing removal projects to be delivered across the metropolitan Melbourne rail network.

Read More
  • Undergoing a Rating
  • Rail

Level Crossing Removal Project-North Western Program Alliance- Reservoir Station

VIC / As Built

The Reservoir level crossing at High Street will be removed and replaced with a rail over road solution including approximately 800 metres of twin elevated structures.

Read More
  • Road

Linkfield Road Interchange

QLD / Design

About The Linkfield Road Interchange is located in the northern suburbs of Brisbane within the Brisbane City Council Local Government Area. Linkfield Road Interchange is the southern most interchange located on Gympie Arterial Road (M3), with Strathpine Road Interchange (and the Bruce Highway) located to its north. Linkfield Road provides an important east-west arterial route

Read More
  • Certified
  • Road

Logan Enhancement Project

QLD / Design

The Logan Enhancement Project (LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion congestion hot spots

Read More
  • Certified
  • Road

Logan Enhancement Project

QLD / As Built

Description The Logan Enhancement Project(LEP) involves widening sections of the Logan and Gateway Extension motorways, including improving key congestion hot spots and constructing new south-facing on and off-ramps on the Gateway Extension Motorway at Compton Road. LEP is made up of five components. It is an integrated transport solution that will unlock the economic potential

Read More
  • Undergoing a Rating
  • Water

Longwarry WRP

VIC / IS Essentials

Augmentation of the Longwarry Water Recycling Plant to meet significant predicted growth within railway corridor catchment area. South East Water believes there is significant opportunity to design and build a low emissions treatment facility that explore opportunities associated with circular economy initiatives for the local community, whilst improving effluent discharge quality and minimising risk to

Read More
  • Undergoing a Rating
  • Water

Lower South Creek Treatment Program

NSW / Design

Sydney Water’s LSCTP i is adopting several innovative process technologies which will be a first for Australia, deliver significant sustainability outcomes, and hopefully help pave the way

Read More
  • Certified
  • Water

Lower South Creek Treatment Program – St Marys and Quakers Hill WRPs

NSW / As Built

Rating Highlights Exceeding energy requirements The project exceeded the IS Rating requirements for Energy & Carbon Monitoring and Reduction & Use of Renewable Energy.  The Base Case footprint for energy and carbon reporting was calculated using a novel approach based upon the Water Services Association of Australia Wastewater Treatment Plant Energy Benchmarking Report. The project

Read More
  • Certified
  • Rail

LXRP – Package 2 – Blackburn Rd, Heatherdale Rd, Furlong Rd, Main Rd

VIC / As Built

This project by the CPB Contractors Pty Limited has achieved an 'Leading' As Built v1.2 IS Rating. The level crossing at Blackburn Road in Blackburn has been removed, with the rail line now lowered under Blackburn Road.

Read More
  • Certified
  • Rail

LXRP – SPA – Additional Works Package 4 (AWP4) – Design

VIC / Design

Description:  The Additional Works Package 4 (AWP4) involves the removal of 2 level crossings through a rail under scenario (Glen Huntly Rd & Neerim Rd), construction of a new station (Glen Huntly station) & signalling improvements at Caulfield Junction.  Rating Highlights  Category  Credits  Achievements/Risks  Management Systems  Man-6  The Project achieved a verified level of 3

Read More
  • Undergoing a Rating
  • Road

LXRP MRPA – Clyde Road, Berwick

VIC / Design

The Clyde road level crossing removal project is on the Pakeham rail line adjacent to Berwick station. Road under rail solution to remove the current interface between road users and rail

Read More
  • Certified
  • Rail

LXRP SEPA Toorak Road

VIC / Design

Rating Highlights People and Place The project achieved a level 3 score of its Hea-1 design submission. In response to three raised priority issue; community connectiveness, skills development and social procurement. Several measures have been incorporated into the design phase of the project. Some of which include: Travelling in the Shoes of Others Workshop, an

Read More
  • Certified
  • Rail

LXRP SPA – Initial Works Package (IWP)

VIC / As Built

Overview The project scope included: Removing four level crossings in Carrum and Seaford Building a new elevated Carrum Station Constructing a road bridge connecting Station Street across Patterson River Constructing the new Kananook Train Storage Facility in Seaford Opening new community spaces and shared-use paths Rating Highlights Aboriginal co-design process Indigenous urban marker at Patterson

Read More
  • Certified
  • Rail

LXRP WPA – Aviation Road & Wyndham Vale Stabling

VIC / As Built

The Level Crossing Removal Project (LXRP) was established by the Victorian Government to oversee one of the largest rail infrastructure projects in the state's history. LXRP is part of the Major Transport Infrastructure Authority and our projects fall under Victoria’s Big Build. Central to the project is the elimination of 75 level crossings across metropolitan Melbourne by 2025, in addition to other rail network upgrades such as new train stations, track duplication and train stabling yards.

Read More
  • Roads Sewerage and Drainage

M1 Pacific Highway extension to Raymond Terrace, Heatherbrae Bypass

NSW / As Built Design

5km dual carraigeway road to be constructed in greenfields environment, drainage, utilities.

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun

QLD / As Built

J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun  Package Number  J323  J324  J325  Package Name  M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh  M1 Pacific Motorway Upgrade Palm Beach to Tugun  M1 Pacific Motorway Upgrade Burleigh to Palm Beach  Capex ($m)  96.8  270.2  208.2  Certified Score  81.62  79.11  81.74  Overall Weighted Average  80.49   

Read More
  • Certified
  • Road

M1 Pacific Motorway Upgrade Burleigh to Palm Beach

QLD / Design

J202 – M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun  Package Number  J323  J324  J325  Package Name  M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh  M1 Pacific Motorway Upgrade Palm Beach to Tugun  M1 Pacific Motorway Upgrade Burleigh to Palm Beach  Capex ($m)  96.8  270.2  208.2  Certified Score  81.62  79.11  81.74  Overall Weighted Average  80.49 

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade Burleigh to Palm Beach

QLD / As Built

Project Highlights Urban Design – Urb-1  The project achieved a level 3 score of 4.69 for this credit.   Key initiatives that led to this score included:     Preparation of a VL2T Landscape and Urban Design Strategy (at the Program level to ensure consistency) and development of a package-specific Urban Design Plan (which responded to the overarching Strategy)   Conducted internal reviews on urban and

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade Palm Beach to Tugun

QLD / As Built

Rating Highlights  Category  Credits  Achievements/Risks  Energy and Carbon  Ene-1  This project achieved a level 2.43 and a verified score of 8.94.  This project achieved this using 3 renewable technologies. These include:   Biofuel Consumption  Wind Farm  Solar Photovoltaic (PV) arrays  Due to the use of these renewable technologies, it has allowed there to be an increase

Read More
  • Road

M1 Pacific Motorway Upgrade Palm Beach to Tugun

/ Design

Project Highlights Energy and Carbon – Ene-1  This project achieved a level 2.43 and a verified score of 8.94. This project achieved this using 3 renewable technologies. These include:   Biofuel Consumption  Wind Farm  Solar Photovoltaic (PV) arrays  Due to the use of these renewable technologies, it has allowed there to be an increase of 179369 GJ

Read More
  • Certified
  • Road

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

QLD / As Built

Description The Varsity Lakes to Burleigh package is under the M1 Pacific Motorway Upgrade – Varsity Lakes to Tugun Program   In this 2km section of the overarching Varsity Lakes to Tugun upgrade, the department has:    widened the M1 to a minimum of 3 lanes in both directions   extended and relocated the Exit 85 northbound off-ramp

Read More
  • Road

M1 Pacific Motorway Upgrade Varsity Lakes to Burleigh

QLD / Design

Project Highlights Materials – Mat-1 The project achieved a level 3 score of 7.24 points for this credit. The Project achieved a 33% reduction in materials use impacts for VL2B-BIC, compared to the base case footprint. Key initiatives that led to this reduction included:  Retaining the existing Reedy Creek Flyover, overall reduction of earthworks. Contributing

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade: Rochedale Bus Station and Park ‘n’ Ride

QLD / As Built

Project Description: A new bus station and park ‘n’ ride facility with capacity for approximately 485 vehicles will be constructed at the corner of School and Underwood Roads in Rochedale. The new bus station and park ‘n’ ride will connect with the South East Busway extension to provide local residents with greater access to public

Read More
  • Undergoing a Rating
  • Road

M1 Pacific Motorway Upgrade: Rochedale Bus Station and Park ‘n’ Ride

QLD / Design

Description A new bus station and park ‘n’ ride facility with capacity for approximately 485 vehicles will be constructed at the corner of School and Underwood Roads in Rochedale. The new bus station and park ‘n’ ride will connect with the South East Busway extension to provide local residents with greater access to public transport

Read More
  • Certified
  • Road

Madden and Pakenham St Road Upgrade

NZ / Design

This project is located within Auckland’s newest waterfront area and urban community, Wynyard Quarter. The project includes a road upgrade of existing Madden Street and Pakenham Street

Read More
  • Registered
  • Railways Roads

Maidstone Tram Maintenance and Stabling Facility

VIC / As Built

The Maidstone Tram Maintenance and Stabling Facility (TMF) project is located within the municipality of Maribyrnong, approximately 10km north-west of the Melbourne Central Business District and is being delivered by the North Western Program Alliance (NWPA). The site is bounded by private residential homes to the north, west and part of the southern boundary, Williamson

Read More
  • Certified
  • Open Space

McDougall’s Lift Replacement

NZ / As Built

Cardrona has made a commitment to be a leader in sustainability. This commitment drives an internal challenge to do better than what we have done in the past, address legacy issues, & look for ways

Read More
  • Certified
  • Rail

Melbourne Metro Tunnel Project

VIC / Design

The completion of the Metro Tunnel Project by 2026 will create space for more trains to run more often across Melbourne’s rail network. This will create capacity for 39,000 more passengers

Read More
  • Certified
  • Road

Monash Freeway Upgrade Stage 2 – As Built

VIC / As Built

Description: The Monash Freeway is in Melbourne’s fast growing south east and outer south east region, carrying over 470,000 trips per day. Works being undertaken by CPB for Stage 2 include the addition of 36 kms of new lanes on the Monash Freeway and Princes Freeways, between Warrigal Rd and EastLink outbound, EastLink to Springvale

Read More
  • Certified
  • Port/Harbour

Moorebank Logistics Park As-Built

NSW / As Built

The Moorebank Logistics Park is a vital piece of infrastructure for Australia and NSW that will transform the way containerised freight moves through Port Botany and deliver a faster, simpler, and more cost-effective service. When completed, the Moorebank facility will move 1.5 million shipping containers annually by rail instead of road, taking 2,700 heavy truck movements off Sydney’s roads each day and reducing greenhouse gas emissions by 110,000 tonnes every year. It will also feature Australia’s largest purpose-built warehouse and distribution precinct serviced by the latest automated technology which will see driverless shuttle carriers collect and transport containers around the precinct to be processed, unpacked and stored on site or distributed in smaller consignments. This facility is an integral component of the Freight, Ports and Transport strategies of both the Commonwealth and NSW governments to help manage the challenges of an expected tripling of freight volumes at Port Botany by 2031. Moorebank Logistics Park will streamline the freight logistics supply chain from ports to store, deliver savings to businesses and consumers, and help service the rapidly growing demand for imported goods in south-west Sydney.

Read More