Forrestfield-Airport Link – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. Now known as the Airport Line, the METRONET Forrestfield-Airport Link included two 8km tunnels, three new stations and a total 16km of rail infrastructure. From 2016, the Public Transport Authority and Webuild-NRW JV worked collaboratively to achieve a minimum Infrastructure Sustainability (IS) Excellent Design Rating and Leading As-Built

Read More

M12 West – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. The M12 West package (M12W), between The Northern Road, Luddenham and approximately 250 metres east of Badgerys Creek, is part of the M12 Motorway, a key part of the Western Sydney Infrastructure Plan. The M12W project consists of a four-lane dual carriageway motorway with a central median for

Read More

Cranbourne Line Upgrade – Eumemmerring Creek Bridge – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. The Eumemmerring Creek Bridge was constructed as part of the Cranbourne Line Upgrade, delivered by the Level Crossing Removal Project’s Western Program Alliance (LXRP, MTM, McConnell Dowell, Mott MacDonald and Arup) and involved the duplication of the train track over the Hallam Main Drain and Eumemmerring Creek (E

Read More

EnergyConnect – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. ElectraNet and Transgrid are partnering to deliver an energy interconnector between the power grids of SA and NSW, with an added connection to Victoria. The NSW section of EnergyConnect is the first project of its kind in Australia to undertake IS Design and As-built ratings. Transgrid’s construction delivery

Read More

Parramatta Light Rail Stage 1 – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. The Parramatta Light Rail (PLR) Stage 1 project continues to deliver beneficial, measurable, and enduring outcomes for the natural environment, through innovations such as: • an Australian-first encapsulating rail boot system to reduce operational noise and vibration • the use of macro synthetic fibres in the concrete track

Read More

Townsville Ring Road (Stage 5) – Re-introduction of Endangered Species through Environmentally Focused Design & Construction – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. The Black-throated finch (southern sub-species) (Poephila cincta cincta) (BTF), classified as ‘Endangered’ under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 and ‘Endangered’ under the Queensland Nature Conservation Act 1992 , is a critical aspect of Townsville Ring Road Stage 5 (TRR5) project’s environment and sustainability goals.

Read More

Innovative use of recycled crushed glass as sand replacement in structural concrete – Tunnels & Stations, Metro Tunnel Project – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. CYP Design & Construction (CYP D&C) is supporting an innovative research study including field trials using recycled crushed glass from kerbside waste as a sand replacement in structural concrete. CYP D&C – a consortium consisting of John Holland Pty Ltd, Lend Lease Melbourne Metro Pty Ltd and Bouygues

Read More

Metro Tunnel Project Rail Infrastructure Alliance – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. The Rail Infrastructure Alliance (RIA), a Rail Projects Victoria (RPV) package of works delivered as part of the Rail Network Alliance, has set a precedent for major rail infrastructure projects by leaving a positive ecological net gain without the need for biodiversity offsetting. RIA has pursued ecological enhancement

Read More

Cairns Southern Access Corridor Stage 3: Edmonton to Gordonvale Project – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. Addressing climate change requires immediate and innovative efforts to reduce carbon emissions, supporting net-zero and fostering the circular economy. The extensive use of plant equipment in construction poses challenges to emissions reduction, demanding creative approaches in material selection and construction methodology. The E2G project has tackled these challenges

Read More

Metro Trains Melbourne Biosite Management Program – Protecting and enhancing biodiversity values within an urban rail environment – Environmental Outcomes

Describe WHAT you have done and HOW you have done it. Starting in 2018, Metro Trains Melbourne (MTM) has established an industry-leading biodiversity program that aims to restore and maintain 30 sites of biodiversity significance across the Melbourne metro network. Rail corridors have long been recognised as ideal biodiversity preservation sites. This concept is acknowledged across Australia, but nowhere

Read More

The Rozelle Interchange Project & Western Harbour Tunnel Southern Tunnel Works – Economic Outcomes

Describe WHAT you have done and HOW you have done it. In 2018, the John Holland CPB Contractors Joint Venture (JHCPB) was contracted by Transport for New South Wales (TfNSW) to deliver the $4.6 billion Rozelle Interchange Project and Western Harbour Tunnel Southern Tunnel Works(RI) – the final stage of the WestConnex program of works and the initial stage

Read More

Townsville Ring Road (Stage 5) – Positive Economic Outcomes Through Collaborative Regional Embankment Design

Describe what you have done and how you have done it The Townsville Ring Road (Stage 5) (TRR5) project team delivered positive economic outcomes through collaborative development of alternative technical specifications when designing and constructing embankments as part of a six-kilometre Bruce Highway duplication project in North Queensland. During the project’s tender phase, the TRR5