Western Sydney Airport Airside Civil and Pavement Works - ISCouncil

Western Sydney Airport Airside Civil and Pavement Works

Project Details

  • Project Owner: CPB Acciona Joint Venture
  • Rating Type: As Built Design
  • Registered Date: October 2021
  • Completion Date: December , 2024
  • Location: NSW
  • Stakeholders: Western Sydney Airport,Aurecon Arcadis Joint Venture,CPB Acciona Joint Venture

Overview

Design and As Built IS ratings have been mandated in the project contracts and will provide the primary system through which we will implement sustainability initiatives and practices and manage our sustainability performance on the Project.

For the Airside Civil and Pavement Works Package, the JV must design, procure, construct, test, commission and handover the works that include:
a) Airfield pavements including the runway, associated taxiways, aircraft isolation and engine run up pads
b) Airfield roads including airside perimeter road, facilities access roads and landside roads in the north west and south west areas of the Airport site
c) Airfield drainage connecting to the trunk drainage system completed by the Bulk Earthworks Contractor (BEC)
d) Airfield facilities including airfield lighting equipment room (ALER) buildings and security restricted area facilities
e) Airfield services including sitewide high voltage (HV) power, sitewide fiber optic cable backbone and hydraulic services to ARFF and aviation fuel farm sites
f) Airfield systems including aeronautical ground lighting, navigational aids and airfield security (including security cameras, lighting and fencing)
g) Airfield infrastructure including services corridor trenching, ducts, conduits and pits within the site
h) Airfield landscaping including placement of final level topsoil across airfield.