The Northern Road Upgrade Stage 4 - ISCouncil

The Northern Road Upgrade Stage 4

Project Details

  • Rating Type: As Built
  • Location: NSW
  • Rating Level: Commended
  • Rating Score: 44.5
  • IS Project manager: Diego Uzzun
  • Stakeholders: Transport for NSW (TfNSW) ,Jacobs Australia,Georgiou & Ertech JV

Description

The Northern Road Upgrade – Stage 4 realigned 5.5km of The Northern Road around the future Western Sydney Airport site. Stage 4 included the construction of a four-lane divided road and the adjustment of public utilities. It will improve traffic flow and connectivity in the western Sydney region and facilitate the construction of Western Sydney Airport.

The Northern Road stages 4, 5 and 6 were assessed under a single EIS - The Northern Road Upgrade – Mersey Road, Bringelly to Glenmore Parkway, Glenmore Park - December 2017. The project was determined by the NSW Minister for Planning under Part 5.1 of the Environmental Planning and Assessment Act 1979 (NSW) (EP&A Act).

The ISC rating was a program rating across stages 4,5 and 6 and occurred under Version 1.2 of the rating scheme. 

Rating Highlights 

Category  Credits  Achievements/Risks 
Climate Change Adaptation  Cli-2  The project achieved a verified Level 3 with a score of 3.73. It demonstrated sustainable practices by: 

- Planning for future climate-resilient infrastructure. 

- Designing for higher temperatures and increased flood events. 

- Using native plants to mitigate landscape degradation. 

- Strengthening riparian corridors for ecological connectivity. 

Energy and Carbon  Ene-1  The Project achieved a verified level of 2.4 with a score of 7.99. 

The project achieved a 21% reduction in lifecycle GHG emissions compared to the base case, equivalent to Level 2.38. 

Materials  Mat-1  The project achieved a verified level of 2.5 with a score of 3.74. It developed a comprehensive materials model for the 100-year lifecycle, using the Schedule of Rates (SOR) for tracking and estimating materials usage. The initiatives resulted in a 22.61% reduction in lifecycle environmental impacts. 

Certification Date

28/6/2024

 

Stay up to date!

Stay up to date with our latest publications and news.