Description
Sydney Metro is Australia's largest public transport project, transforming Sydney with more trains and faster services. At Central Station, construction includes:
- Two new underground concourses
- North-South Concourse above the new Metro station
- Central Walk for better connectivity to trains, light rail, and new Metro platforms
- Demolition and reconstruction of suburban rail platforms 12, 13, and 14, shifted 2.5m for the new Northern Concourse
- Refurbishment of Northern and Grand Concourse with a new vaulted roof and large void revealing heritage buildings
- A new Eastern Entrance for access from Chalmers Street's light rail stop, through demolition and excavation below an existing building.
Rating Highlights
Category | Credits | Achievements/Risks |
Energy and Crabon | Ene-1 | The Project achieved a verified level of 3 with a score of 12.11.
The Project collectively supported the project’s energy sustainability criteria, emphasizing longevity, efficiency, and reduced environmental impact across its lifecycle. The Project focused on key aspects:
|
Water | Wat-1 | The Project achieved a verified level of 3 with a score of 6.06.
The Project implemented efficient water management practices and optimized water usage across different phases. Some of the key initiatives are: - Non-potable water sources were effectively utilized, reducing reliance on potable water and minimizing environmental impact. - Robust methodologies were employed to calculate water usage accurately, even in cases where meter readings were unavailable, ensuring transparency in reporting. - Continuous improvement efforts included reviewing and updating formulas and calculations in the water balance model to maintain consistency and align with sustainability goals. As a result, the Project achieved a significant 24.6% reduction in water consumption compared to the base case, demonstrating a strong commitment to sustainable water management and environmental stewardship.
|
Heritage | Her-1 | The Project achieved a verified level of 3 with a score of 4.49.
The project successfully integrated community heritage values through the following initiatives: - Consultation and Engagement: Engaged with Aboriginal stakeholders through formal consultation processes led by Dr. Sandra Wallace, gathering cultural knowledge and feedback on heritage impacts. - Managed an 18-month excavation at the former Devonshire Street Cemetery, preserving Aboriginal and European artefacts and human remains with care. - Interpretation and Recognition: Integrated identified heritage values into the project's interpretation plan, acknowledging the area's historical significance as a cultural corridor and gathering place for Aboriginal communities. These initiatives underscore the project's commitment to respecting and incorporating community heritage values, ensuring their preservation and meaningful inclusion in project planning and execution. |
Verified Innovations
Name | Verification Date | Innovation Type | Description & Sustainability Benefits |
Inn-1 Return and Donate | 6/5/2024 | Market Transformation | The Project received 1 point.
The ‘Return and Donate’ initiative implemented on site by the project with the help of Citizen Blue is transforming the waste market in NSW by promoting personal recycling practices, reducing waste, and simultaneously supporting local charities. |
Inn -2 GECA Waste Services | 20/12/2023
|
Innovative Technology or Process
Australian First |
The Project received 3 points.
GECA for Waste Collection Service standard is a process, that results in a new approach in improving supply chains. Overall, the certification helped create change in the broader construction marketplace by presenting the benefits in improving the sustainability credentials of waste collection services which can also be applied to other industries. |
Certification Date
23/7/2024 |