The Sydney Metro West, Eastern Tunnelling Package (ETP) involves the delivery of:
Enabling works such as demolition, utility supply to construction sites, utility adjustments and modifications to the existing transport network
Mined crossover cavern construction east of The Bays Station
4.2km of TBM Tunnel excavation, 650m of mined tunnels and 7 cross passage excavation, from The Bays to Sydney CBD
Excavation for two new underground metro stations at Pyrmont and Hunter Street
Construction of a turnback, crossover tunnels and caverns at the eastern end of the tunnel section
A concrete segment facility for use during construction located at Eastern Creek.